Analisis Rencana Anggaran Biaya Pada Bangunan Gedung Student Center Universitas Atma Jaya Yogyakarta

  • Maria Carvallo Putri Jea Institut Teknologi Nasional Yogyakarta
  • Sely Novita Sari Institut Teknologi Nasional Yogyakarta
  • Anggi Hermawan Institut Teknologi Nasional Yogyakarta

Abstract

Cost estimation is a critical aspect of project execution, serving to ascertain the necessary funding for construction. This research centers on the Estimated Budget Plan (Rencana Anggaran Biaya or RAB) for the construction of Atma Jaya University Yogyakarta's Student Center Building. Its primary objective is to determine the comprehensive cost for the building's construction. Adhering to the SNI No. 1 of 2022 guidelines, the research employs a combination of primary and secondary data collection methods, drawing from sources like Plan Drawings, the Unit Price of Goods and Services (SHBJ), and Unit Price Analysis Guidelines. Subsequently, the research involves several key steps, including quantifying the volume of each type of work, assessing unit prices for these tasks, formulating the budget plan, and concluding with a comprehensive summary of costs for each category of work. Microsoft Excel is the tool of choice for these budget plan calculations. The analytical process encompasses volume computations, unit price assessments, and the final RAB, yielding a total cost estimate of Rp 71,899,735,842.00 for the construction of the Student Center Building at Atma Jaya University Yogyakarta.

References

Pilutomo, B., & Agustapraja, H. R. (2020). Perbandingan Estimasi Anggaran Biaya Antara Metode BOW, SNI dan Perhitungan Kontraktor. JUTEKS: Jurnal Teknik Sipil, 5(1), 55-66.
Sari, S. N., Triwuryanto, T., & Ramadhanti, A. T. (2022). Perhitungan Rancangan Anggaran Biaya Embung Desa Kalirejo, Kulon Progo DIY. Jompa Abdi: Jurnal Pengabdian Masyarakat, 1(2), 32-40.
Ibrahim, H.Bachtiar. 1993. Rencana dan Estimate Real Of Cost. Cetakan ke -2. Penerbit Bumi Aksara, Jakarta.
Sari, S. N. (2019). Evaluasi Anggaran Biaya menggunakan Batu Bata Merah dan Batu Bata Ringan Gedung Kantor Kelurahan Bareng Kecamatan Klaten Tengah Kabupaten Klaten. Jurnal Qua Teknika, 9(1), 1-10.
Mokoagow, F. N., Pranomo, D., Mopio, I., Anggorowati, V. D. A., Sari, S. N., & Prastowo, R. (2022). Pendampingan Perancangan Gedung PAUD di Kalurahan Kalirejo, Kecamatan Kokap, Kulon Progo. Sewagati, 6(3), 382-388.
Pahlevi, R., & Sari, S. N. (2020). Analisis Rencana Anggaran Biaya (Rab) Rumah Tipe 86 Di Semarang Jawa Tengah. Equilib, 1(1), 91-102.
Published
2023-11-11
How to Cite
Putri Jea, M. C., Sari, S. N. and Hermawan, A. (2023) “Analisis Rencana Anggaran Biaya Pada Bangunan Gedung Student Center Universitas Atma Jaya Yogyakarta”, ReTII, 18(1), pp. 881-886. Available at: //journal.itny.ac.id/index.php/ReTII/article/view/4616 (Accessed: 9November2024).