Penentuan Tinggi Stemming Dan Jarak Burden Berdasarkan Jarak Flyrock Di Pit Inul Middle Panel 3 PT. Kaltim Prima Coal Kalimantan Timur

  • Yekeskiel Nimsi Universitas Mulawarman
  • Windhu Nugroho Universitas Mulawarman
  • Revia Oktaviani Universitas Mulawarman

Abstract

Stripping overburden using the blasting method is more economical than using equipment. One of the impacts caused by blasting activities is flyrock. Flyrock influences how far people and units have to be evacuated during blasting activities, so by controlling flyrock the evacuation distance can be reduced based on existing studies, in accordance with Ministerial Decree No. 1827.K/30/MEM/2018. By using the Richard and Moore equation, the distance of the flyrock throw can be predicted by approaching constant values ​​adjusted to the actual conditions at Pit Inul Middle. The research results show that there are several factors that influence the occurrence of flyrock, namely burden with a coefficient of determination value of 0.5183 and stemming height with a coefficient of determination value of 0.4142. Both of these factors have a moderate (medium or sufficient) correlation with flyrock. The actual average distance of flyrock that occurred during data collection was 11.58 meters and the furthest was 39.74 meters. By knowing the prediction of the maximum flyrock throw and considering the safety factor of the equipment, standard values ​​for the stemming and burden height variables can be set, namely a minimum of 2 meters.

References

[1] Abdurrachman, H., Saptono, S. dan Wiyono, B., 2015. Analisis Flyrock Untuk Mengurangi RadiusAman Alat Pada Peledakan Overburden Penambangan Batubara. Prosiding Seminar Nasional Kebumian Ke-8. Yogyakarta: UPN Veteran Yogyakarta.Anggara, R., (2017). Teknik Peledakan. Balai Pendidikan Dan Pelatihan Tambang Bawah Tanah, Vol. 2 : 61.
[2] Bhandari, S., 1997. Engineering Rock Blasting Operations. Balkema : Rotterdam
[3] Elifson, K.W, and R. Runyon. 1990. Fundamental of Social Statistics. Second Edition. McGraw-Hill International Edition. Singapore.
[4] Gokhale, B., (2011). Rotary Drilling And Blassting In Large Surface Mines. Press/Balkema
[5] Keputusan Menteri ESDM Nomor 1827 Tahun 2018 tentang Pedoman Pelaksanaan Kaidah Teknik Pertambangan yang Baik
[6] Masda, R.S., 2021. Implementasi Bottom Air Deck dan Expand Pattern Secara Terintegrasi Dalam Rangka Optimalisasi Penggunaan Bahan Peledak Di Pit South Pinang PT Kaltim Prima Coal. Indonesian Mining Professionals Journal Volume 3, Jakarta
[7] Moelhim, K., 1990. Teknik Peledakan. Universitas Teknologi Bandung : Bandun
[8] Richard, Alan B., Adrian J. Moore., 2005. Golden Pike Cut Back Fly Rock Control and Calibration of a Predictive Model. Terrock Consulting Engineers, Australia.
[9] Suwandhi, A., 2004. Teknik Peledakan. Pusdiklat Teknologi Mineral dan Batubara : Bandung
[10] Taylor, R., 2010. Macraes Phase III Vibration and Air Blast Assessment Orica Mining Services, New Zealand.
Published
2023-11-11
How to Cite
Yekeskiel Nimsi, Windhu Nugroho and Oktaviani, R. (2023) “Penentuan Tinggi Stemming Dan Jarak Burden Berdasarkan Jarak Flyrock Di Pit Inul Middle Panel 3 PT. Kaltim Prima Coal Kalimantan Timur”, ReTII, 18(1), p. 933~940. Available at: //journal.itny.ac.id/index.php/ReTII/article/view/4625 (Accessed: 10May2024).