Faktor Keterlambatan Pada Proyek Pembangunan Gedung Balai Nikah dan Manasik Haji Keccamatan Dumoga Utara di Kabupaten Bolaang Mongondow

  • Teguh Hadi Riswanto Institut Teknologi Nasional Yogyakarta
  • Sely Novita Sari Institut Teknologi Nasional Yogyakarta
  • Rizal Maulana Institut Teknologi Nasional Yogyakarta

Abstract

In planning a project, it is necessary to have an activity schedule that can be used as a guide by implementers in carrying out their activities in the field, this shows that scheduling is very influential in the implementation of a project. Good project scheduling can make a project run effectively and efficiently, but in reality it is not always the same as what was planned. In this case, it can be seen in the implementation of the construction of the Marriage Hall and Hajj Pilgrimage Building in Dumoga Utara District in Bolaang Mongondow Regency. In the construction process for the construction of the Balai Nikah and Manasik Haji Building, North Dumoga District in Bolaang Mongondow Regency, there were delays caused by several factors in the field, resulting in a delay of 25 days which was originally planned to be completed in 120 days but in the field the project was completed in 145 days. Because this happens, an analysis of project scheduling is carried out in order to find out what causes delays in the project. From the results of the analysis obtained, the cause of the delay is in the foundation work item. Factors that cause delays are unfavorable weather, lack of labor, and contractors.

References

Dipohusodo, I. (1996). Manajemen proyek & Konstruksi Kanisius. Jogyakarta
Ervianto, W. I. (2002). Manajemen Proyek Konstruksi. Edisi Kedua (Edisi Revisi). Yogyakarta. Yogyakarta: Andi
Aji, M. T. J., & Sari, S. N. (2020). Analisis Biaya Percepatan Proyek Konstruksi Ruko Yuliani Dengan Menggunakan Metode Time Cost Trade Off di Pasar Klewer Surakarta. Equilib, 1(1), 63-72.
Sari, S. N., Hermawan, A., & Herbyanto, C. W. (2022). Analisis Percepatan Proyek Menggunakan Metode Crashing Dengan Penambahan Tenaga Kerja Dan Shift Kerja (Studi Kasus: Proyek Pembangunan Jembatan Damai, Kalimantan Timur). ReTII, 597-607.
Maulana, R., Pancarani, M., & Sari, S. N. (2022, July). Analisis Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bendung (Studi Kasus: Rehabilitasi Bendung Notog Kabupaten Tegal Jawa Tengah). In Seminar Nasional Riset & Inovasi Teknologi (Vol. 1, No. 1, pp. 645-654).
Flegon, F., Sari, S. N., & Hermawan, A. (2021). Analisis Faktor Penyebab Pekerjaan Ulang (Rework) Pada Proyek Bangunan Gedung di Daerah Istimewa Yogyakarta. EQUILIB, 2(1), 67-76.
Sari, S. N. (2019). Mankon Analisis Pengaruh Manajemen Konstruksi Terhadap Kesuksesan Operasional Proyek Dikabupaten Sleman Dan Kota Madya Yogayakarta. ReTII, 457-464.
Amalia, R., Rohman, M. A., & Nurcahyo, C. B. (2012). Analisa Penyebab Keterlambatan Proyek Pembangunan Sidoarjo Town Square Menggunakan Metode Fault Tree Analysis (FTA). Jurnal Teknik ITS, 1(1), D20-D23.
Analysa, D., Suhudi, S., & Rahma, P. D. (2019). Evaluasi Keterlambatan Proyek Pembangunan Graha Mojokerto Service City (GMSC) dengan Metode Fault Tree Analysis (FTA). Reka Buana, 4(2), 112-119.
Published
2023-11-11
How to Cite
Hadi Riswanto, T., Sari, S. N. and Maulana, R. (2023) “Faktor Keterlambatan Pada Proyek Pembangunan Gedung Balai Nikah dan Manasik Haji Keccamatan Dumoga Utara di Kabupaten Bolaang Mongondow”, ReTII, 18(1), pp. 982-987. Available at: //journal.itny.ac.id/index.php/ReTII/article/view/4634 (Accessed: 27December2024).