EVALUATION OF THE IMPACT OF CAPACITOR BANK CAPACITY ON ENERGY EFFICIENCY AND POWER FACTOR AT ASTON INN HOTEL TASIKMALAYA
Abstract
This study aims to evaluate the impact of capacitor bank capacity on energy efficiency and power factor at Aston Inn Hotel Tasikmalaya. The hotel's electrical system is characterized by a predominance of inductive loads, which generate a considerable amount of reactive power, thereby decreasing the overall power factor. To address this issue, capacitor banks are commonly used as a power factor correction tool, helping to reduce reactive power, minimize energy losses, and lower operational costs. However, the correct sizing of capacitor banks is crucial, as incorrect capacities can lead to system inefficiencies and potential instability. In systems where the power factor is low, there is an increase in electrical current, which contributes to higher energy losses in the form of heat and, consequently, elevated operational expenses. This study adopts a comprehensive approach involving direct measurement of the hotel's electrical system, detailed analysis of load data, and calculation of the ideal capacitor bank capacity required for optimal performance. The aim is not only to improve energy efficiency but also to enhance the overall stability and safety of the hotel's electrical network. The results of this research reveal that the currently installed capacitor bank has a capacity of 300 kVAr, which is significantly larger than the ideal requirement of 55 kVAr as determined through load analysis. This substantial excess in capacity results in a power factor shift from lagging to leading. Such a shift can lead to adverse effects on the electrical system, including potential instability, equipment malfunction, and increased wear and tear on system components. Additionally, it was discovered that the existing Power Factor Controller (PFC) is not operating at its optimal setting, further complicating the situation and preventing the system from achieving the desired power factor improvements. Based on these findings, it is recommended that adjustments be made to the capacitor bank capacity to align with the calculated ideal value. Moreover, a reconfiguration and proper tuning of the Power Factor Controller are necessary to ensure optimal performance. These corrective actions are expected to enhance power factor correction, improve energy efficiency, reduce operational costs, and maintain system stability within the hotel's electrical network.
Downloads
References
[2] B. Ferdiansah, A. Margiantono, and F. Ahmad, “Analisis Pengaruh Kapasitor Bank Terhadap Nilai Faktor Daya Dan Nilai Jatuh Tegangan,†Jambura J. Electr. Electron. Eng., vol. 5, no. 2, pp. 234–241, 2023, doi: 10.37905/jjeee.v5i2.20893.
[3] W. Wirawan, N. Hiron, and N. Busaeri, “Analisis Potensi Peluang Penghematan Konsumsi Energi Di Brits Hotel Karawang,†J. Energy Electr. Eng., vol. 2, no. 1, pp. 1–9, 2020, doi: 10.37058/jeee.v2i1.2141.
[4] A. I. Almira, T. Tohir, K. Kunci, B. Kapasitor, F. Daya, and B. T. Listrik, “Analisa Pengaruh Kapasitor Bank Terhadap Faktor Daya dan Penghematan Biaya Listrik Berbasis Simulasi Software ETAP 20,†pp. 24–25, 2024.
[5] B. Williams, D. Bishop, P. Gallardo, and J. G. Chase, “Demand Side Management in Industrial, Commercial, and Residential Sectors: A Review of Constraints and Considerations,†Energies, vol. 16, no. 13, 2023, doi: 10.3390/en16135155.
[6] A. Otsuka, “Demand for industrial and commercial electricity: evidence from Japan,†J. Econ. Struct., vol. 4, no. 1, pp. 1–11, 2015, doi: 10.1186/s40008-015-0021-8.
[7] J. Deason and M. Borgeson, “Electrification of Buildings: Potential, Challenges, and Outlook,†Curr. Sustain. Energy Reports, vol. 6, no. 4, pp. 131–139, 2019, doi: 10.1007/s40518-019-00143-2.
[8] I. K. Adi Partayasa, I. M. Agus Mahendra, and I. M. Juniastra, “ANALISIS PENGHEMATAN ENERGI LISTRIK DALAM MEWUJUDKAN KONSEP GREEN SOLAR PANEL PADA INDUSTRI PERHOTELAN DI BALI. Studi Kasus Di Bvlgari Hotel And Resort Bali,†J. Ilm. Vastuwidya, vol. 6, no. 2, pp. 79–87, 2023, doi: 10.47532/jiv.v6i2.916.
[9] L. M. Dibene-Arriola, F. M. Carrillo-González, S. Quijas, and M. C. RodrÃguez-Uribe, “Energy efficiency indicators for hotel buildings,†Sustain., vol. 13, no. 4, pp. 1–11, 2021, doi: 10.3390/su13041754.
[10] R. S. Arenhart, A. M. Souza, and R. R. Zanini, “Energy Use and Its Key Factors in Hotel Chains,†Sustain., vol. 14, no. 14, pp. 1–14, 2022, doi: 10.3390/su14148239.
[11] E. López-Bernabé, S. Foudi, P. Linares, and I. Galarraga, “Factors affecting energy-efficiency investment in the hotel industry: survey results from Spain,†Energy Effic., vol. 14, no. 4, 2021, doi: 10.1007/s12053-021-09936-1.
[12] H. do N. Alves, “Power Factor Correction and Harmonic Filtering Planning in Electrical Distribution Network,†J. Control. Autom. Electr. Syst., vol. 27, no. 4, pp. 441–451, 2016, doi: 10.1007/s40313-016-0247-1.
[13] S. Jamilah, I. Usrah, and A. Chobir, “Analisis Pengaruh Perubahan Faktor Daya Dari Lagging Menjadi Leading Di Favehotel Tasikmalaya,†J. Energy Electr. Eng., vol. 04, no. 01, pp. 6–12, 2022.
[14] R. N. Prasetyono, R. Mubarok, R. C. Sigitta, M. Z. Alfarikhi, N. Nasrulloh, and R. A. Murdiantoro, “Pengaruh Penambahan Kapasitor Bank terhadap Perbaikan Daya pada Direct On Line (DOL) Berbasis Programmable Logic Controller (PLC) di Motor Listrik 3 Phase,†J. Telecommun. Electron. Control Eng., vol. 5, no. 2, pp. 132–143, 2023, doi: 10.20895/jtece.v5i2.1066.
[15] R. A. Fahlevi and P. Prihono, “Peningkatan Produktivitas Pabrik Kertas Dengan Mempertimbangkan Power Faktor Dan Menggunakan Kapasitor Bank Di Pt Dayasa Aria Prima,†J. Rekayasa Sist. Ind., vol. 8, no. 2, pp. 51–59, 2023, doi: 10.33884/jrsi.v8i2.7260.
[16] M. Syukri, Suriadi, I. D. Sara, R. H. Siregar, Muhibbuddin, and Masri, “Optimalisasi Performa Sistem Tegangan dengan Pemasangan Kapasitor Bank pada Pembangkit Listrik Tenaga Uap (PLTU) Nagan Raya,†J. Eng. Sci., vol. 2, no. 1, pp. 36–44, 2023, doi: 10.56347/jes.v2i1.165.
[17] C. Adragna, A. Bianco, G. Gritti, and M. Sucameli, “State-of-the-Art Power Factor Correction : An Industry Perspective,†pp. 1324–1354, 2024.
[18] P. Nanda, C. K. Panigrahi, and A. Dasgupta, “Reactive power monitoring and compensation in a distribution network of modern power system,†Int. J. Appl. Eng. Res., vol. 12, no. 22, pp. 12395–12402, 2017.
[19] A. E. Rashad Bakr and F. M. Alsubaie, “A study on Power Factor Correction with Capacitor Bank Using ERACS’ Software,†Int. J. Eng. Res. Appl. www.ijera.com, vol. 11, no. 1, pp. 47–54, 2021, doi: 10.9790/9622-1101024754.
[20] A. P. Singh and M. K. Srivastava, “Power Factor Correction using capacitor bank under Variable Load Condition,†vol. 8, no. 5, pp. 1204–1209, 2018.
[21] I. W. Sutama and D. Candra, “Analisis Perbaikan Faktor Daya Pada Tranformator 2500KVA/400V di Bandar Udara I Gusti Ngurah Rai Bali,†J. Ilm. Telsinas Elektro, Sipil dan Tek. Inf., vol. 6, no. 1, pp. 37–45, 2023, doi: 10.38043/telsinas.v6i1.4321.
[22] B. F. Alfianto and I. H. Kurniawan, “Rancang Bangun Pengendali Kapasitor Bank Untuk Koreksi Faktor Daya Listrik Berbasis Internet of Things,†J. Ris. Rekayasa Elektro, vol. 4, no. 2, p. 79, 2023, doi: 10.30595/jrre.v4i2.11624.
[23] M. Salehi, V. Filimonau, Z. Ghaderi, and J. Hamzehzadeh, “Energy conservation in large-sized hotels: Insights from a developing country,†Int. J. Hosp. Manag., vol. 99, no. September, p. 103061, 2021, doi: 10.1016/j.ijhm.2021.103061.
[24] F. X. S. Agus, F. X. S. Agus, and I. M. Suartika, “AUDIT DAN ANALISIS PENGHEMATAN ENERGI LISTRIK DI HOTEL SUN ISLAND BALI,†J. SPEKTRUM Vol. 7, No. 1 Maret 2020, vol. 7, no. 1, pp. 62–68, 2020.
[25] M. D. Karvounidi, A. P. Alexandropoulou, and A. E. Fousteris, “Towards Sustainable Hospitality : Enhancing Energy Efficiency in Hotels,†vol. 3, no. 6, pp. 410–420, 2024, doi: 10.56472/25835238/IRJEMS-V3I6P145.
Copyright (c) 2024 Linda Faridah, Rivaldi Vadilah, Ifkar Usrah
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
This journal provides immediate open access to its content on the principle that making research freely available to the public supports a greater global exchange of knowledge.
All articles published Open Access will be immediately and permanently free for everyone to read and download. We are continuously working with our author communities to select the best choice of license options, currently being defined for this journal as follows:
• Creative Commons Attribution-ShareAlike (CC BY-SA)
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.