A Implementation of Progressive Cavity Pump (PCP) Sand Abrasive Resistance Technology at Well Q-01 of Field X, Pertamina Hulu Rokan Regional 1
Implementation of Progressive Cavity Pump (PCP) Sand Abrasive Resistance Technology at Well Q-01 of Field X, Pertamina Hulu Rokan Regional 1
Keywords:
Progressive Cavity Pump (PCP); Sand Abrasive Resistance; Loss Production Opportunity (LPO)Abstract
Well Q-01 in Field X, operated under the management of Zone 4 Pertamina Hulu Rokan (PHR) Regional 1, has encountered significant production challenges due to excessive sand production. This condition frequently leads to pump stuck incidents, resulting in considerable Loss Production Opportunity (LPO). The artificial lift system currently in use, the Electric Submersible Pump (ESP), has proven to be inefficient under abrasive fluid conditions, with an average run life of less than four months. Consequently, the well requires frequent servicing, which escalates operating expenditures and disrupts the continuity of oil production. As a strategic solution, PHR, through the Networked Collaboration for New Potential (NCNP) program initiated by Subholding Upstream (SHU), in collaboration with PT. SH, has conducted a pilot test of the Progressive Cavity Pump (PCP) equipped with Sand Abrasive Resistance technology. The PCP was selected for its ability to handle fluids with high sand content and abrasive characteristics. The implementation of PCP in Well Q-01 is expected to achieve several key outcomes: extending the run life to beyond four months, reducing the frequency of well servicing operations, lowering operational costs, and enhancing oil production performance. This initiative is anticipated to provide a more reliable artificial lift solution for sand-prone wells in Zone 4, thereby contributing to improved production stability and operational efficiency in PHR Regional 1.
References
Pertamina Hulu Rokan. Laporan Operasi Lapangan X: Produksi dan Kinerja Artificial Lift 2023–2024. Pekanbaru: PHR; 2024.
Pertamina Hulu Rokan (PHR). Laporan Data Historis Run Life Artificial Lift Zona 4 Periode Januari 2023 – Juni 2024. Pekanbaru: PHR Regional 1; 2024.
Pertamina Hulu Rokan (PHR). Laporan Kegagalan ESP dan Hasil Sand Cut Analysis Sumur Produksi Zona 4. Pekanbaru: PHR Regional 1; 2024.
Takács G. Electrical Submersible Pumps Manual: Design, Operations, and Maintenance. 2nd ed. Gulf Professional Publishing; 2017.
Takács G. Progressing Cavity Pumping Systems: Design, Operations and Maintenance. Gulf Professional Publishing; 2009.
Economides MJ, Nolte KG. Reservoir Stimulation. 3rd ed. Chichester: John Wiley & Sons; 2000.
Smith J, Lea JF. Artificial Lift Methods in Oil Production. Richardson, TX: Society of Petroleum Engineers (SPE); 2016.
Brown KE. The Technology of Artificial Lift Methods, Volume 2. Tulsa: PennWell Books; 1980.
Pilehvari A, Kumar A. Evaluation of PCP in Sand Producing Wells. SPE Production & Facilities; 2004.
Downloads
Published
How to Cite
Issue
Section
License
Prosiding ini memberikan akses terbuka langsung ke isinya dengan prinsip bahwa membuat penelitian tersedia secara gratis untuk publik mendukung pertukaran pengetahuan global yang lebih besar.
Semua artikel yang diterbitkan Open Access akan segera dan secara permanen gratis untuk dibaca dan diunduh semua orang.