ANALISIS PEMBEBANAN JEMBATAN BH-1979 JALUR KERETA API BANDARA YIA

  • ZAKI AFLAH RAMADHAN ITNY
  • LILIS ZULAICHA ITNY
  • ISMANTO HS ITNY
Keywords: Plate Girder, Railway Bridge, Steel Bridge, Yogyakarta International Airport

Abstract

Yogyakarta International Airport, is a new airport which built because Adisucipto Airport exceeds operating capacity. But, the existence of a new airport in Kulon Progo raises several new problems, one of which is the accessibility of public transportation. The ease of accessibility of public transportation, especially trains is very important, so that in 2020 the YIA Airport Railway construction project began. One of the bridges used on the YIA Airport Railway is the WTP Double which is steel bridge. It will review the design of the plate girder from the BH-1979 Bridge which is a WTP Double bridge located at stationing 0+175.

The method used in the completion of this final project begins with observing the BH-1979 Bridge, then taking data from Istaka-Catur-Mina, KSO. Furthermore, the calculation of the load using PM Nomor 60 Tahun 2012 and SNI 2833:2016 and analyzed using SAP2000.

The results of the analysis obtained are, Vu = 214,834 kN and Mu = 470,472 kNm on Stringer Beam. Then, Vu = -596,926 kN and Mu = 1.490,0013  kNm on Floor Beam. Latest Vu = 1.559,721 kN and Mu = 9.798,9593 kNm on Main Girder.

Keywords: Plate Girder, Railway Bridge, Steel Bridge, Yogyakarta International Airport

References

Aditya W. 2020. Mengenal Jenis-Jenis Jembatan Kereta Api. URL: https://keretapedia.com/2020/04/15/jembatan-kereta-api/. Diakses Tanggal 2 Maret 2021.
Alfian, I. dan I. Sulistyowati. 2018. Evaluasi Pembebanan Kereta Api Lokomotif Ganda Yang Beroperasi Di Indonesia Terhadap Rencana Muatan 1921. Universitas Trisakti.
Anonim. 2016. Pembebanan untuk Jembatan. Badan Standarisasi Nasional. Jakarta.
Anonim. 2016. Perencanaan Jembatan terhadap Beban Gempa. Badan Standarisasi Nasional. Jakarta.
Asri, R. 2013. Balok Pelat Berdinding Penuh (Girder Plate Beam). Fakultas Teknis UIGM. Palembang.
Biro Komunikasi dan Informasi Publik. 2019. Menhub: Pembangunan Jalur KA Ke Bandara YIA Ditargetkan Selesai Tahun 2020. URL: http://dephub.go.id/post/read/menhub-pembangunan-jalur-ka-ke-bandara-yia-ditargetkan-selesai-tahun-2020. Diakses Tanggal 24 Februari 2021.
Jaya, T. 2018. Perbandingan Jembatan Rangka Baja Kereta Api Dengan Sistem Busur Atas Dan Bawah. Universitas Muhammadiyah Sumatera Utara.
Muspitasari, T., I. Sulistyowati, W. Kumara. 2017. Evaluasi Peraturan Pembebanan Gandar Kereta Api Di Pulau Jawa Terhadap Kondisi Aktual. Universitas Trisakti.
Pemerintah Indonesia. 2012. Peraturan Menteri Nomor 60 Tahun 2012 Tentang Persyaratan Teknis Jalur Kereta Api. Menteri Perhubungan Republik Indonesia. Jakarta.
Salmon, C.G. dan Johnson, J.E. 1997. Struktur Baja. Edisi Kedua, Penerbit Erlangga. Jakarta.
Supriyadi, B. dan A.S. Muntohar. 2007. Jembatan. Edisi Pertama, Beta Offset. Yogyakarta.
Published
2021-11-09
How to Cite
ZAKI AFLAH RAMADHAN, LILIS ZULAICHA and ISMANTO HS (2021) “ANALISIS PEMBEBANAN JEMBATAN BH-1979 JALUR KERETA API BANDARA YIA”, ReTII, pp. 162 - 166. Available at: //journal.itny.ac.id/index.php/ReTII/article/view/2655 (Accessed: 29March2024).