Evaluasi Kinerja Unit Crushing Plant Untuk Mencapai Target Produksi di PT. Sugih Alamanugroho, Kabupaten Gunung Kidul, Provinsi Daerah Istimewa Yogyakarta
Abstract
PT. Sugih Alamanugroho is a company that operates in the mining and processing of limestone. The limestone processing factory is located in Bedoyo Village, Ponjong District, Gunung Kidul Regency, Yogyakarta Special Region Province. This research was conducted to understand the technical aspects of the processing unit and provide alternative improvements that can be made to achieve the ideal daily production target. The research results show that the employee's working time schedule is 14 working hours. The reduction in time for obstacles that cannot be avoided is 32.1 minutes and obstacles that can be avoided is 437.8 minutes. Jaw Crusher tool availability value, Mechanical Availability 100%, Use Availability 58%, Physical Availability 100%, Effective Utilization 58%. Hammer Crusher, Mechanical Availability 100%, Use Availability 58%, Physical Availability 100%, Effective Utilization 58%. Pulverizer, Mechanical Availability 95%, Use Availability 59%, Physical Availability 97%, Effective Utilization 58%. Hourly production from processing equipment is 6.18 tons/hour, product details < 0.150 mm are 6 tons/hour or 97%, products measuring 0.105-149 mm are 0.18 tons/hour or 3%. Effective working hours are 13.5 hours per day producing 83.4 tons/day. Production results of 83.4 tons/day have not reached the production target of 100 tons/day. After the evaluation is carried out, to increase production results in order to achieve production targets is by improving employee working time scheduling to 18 working hours. Then the time for obstacles that cannot be avoided becomes 30 minutes and obstacles that can be avoided is 0 minutes. Furthermore, improvements to the value of Jaw Crusher tool availability, Mechanical Availability 100%, Use Availability 96%, Physical Availability 100%, Effective Utilization 96%. Hammer Crusher, Mechanical Availability 100%, Use Availability 96%, Physical Availability 100%, Effective Utilization 96%. Pulverizer, Mechanical Availability 96%, Use Availability 100%, Physical Availability 97%, Effective Utilization 96%. The production per hour from processing equipment that can be achieved is 6.18 tons/hour, product details < 0.150 mm is 6 tons/hour or 97%, products measuring 0.105-149 mm are 0.18 tons/hour or 3%. For effective working hours of 17.5 hours per day producing 108.5 tons/day. The production results from the improvement alternative were 108.5 tons/day, which has reached the production target of 100 tons/day.
References
Aisyah, “Optimalisasi Kinerja Alat Peremuk pada PT. Indocement Tunggal Prakarsa untuk Pencapaian Target Produksi Sement,” Skripsi, Prodi. T. Pertamb., Fak. Sains & Teknologi, Universitas Islam Negeri Syarif Hidayatullah, Jakarta, 2019.
M. Aziz, “Batu Kapur dan Peningkatan Nilai Tambah,” Semanticscholar.org., pp. 116-131, 2010.
M. I. P. Bangalore, “Experimental Study of The Control of Operating Modes of A Plate Feeder Based on The Frequency-Controlled Electric Drive,” E3S Web of Conferences, EDP Sciences, 2021, p. 288.
R. W. van Bemmelen, “The Geology of Indonesia,”Netherland: The Haque, Martinus Nyhoff, 1949.
Denna, “Kajian Teknis Produktivitas Unit Peremuk Batu Andesit di PT. Gawi Maju Karsa Kabupaten Purworejo Provinsi Jawa Tengah,” Skripsi, Universitas Pembangunan Nasional, Yogyakarta, 2019.
A. K. Lobeck, “Geomorphology,” New York and London: Mc Graw-Hill Book, 1984.
S. Martodjojo, “Evolusi Cekungan Bogor, Jawa Barat,” Disertasi, ITB, Bandung. 1939.
L. Michaud, “911 metallurgist,” 2016. [online]. Available at: https://www.911metallurgist.com/blog/apron [diakses: Juni 2022].
K. A. Munif, “Pengoperasian Pulverizer (mill) dan Coal Feeder pada PLTU Suralaya unit 1-4,” 2015.
P. T. G. Suwarsa dan I. N. W. Negara, “Potensi Batu Kapur Nusapenida sebagai Agregat Perkerasan Jalan,” Jurnal Ilmiah Teknik Sipil, vol. 14, no. 1, pp. 69-7, 2021.
Wilss, “Mineral Processing Technology An Inroduction to The Practical,” 2016.
S. Suwaji, “Permasalahan Geometri Ruang Pusat Pengembangan dan Pemberdyaan Pendidikan dan Tenaga Kependidikan Matematika,” Yogyakarta, 2008, pp. 22-26.
M. Nasuhi, E. T. Tono, dan G. Guskarnali, “Optimalisasi dan Produktivitas Alat Gali-Muat dan Alat Angkut pada Tambang Batu Granit PT Vitrama Properti di Desa Air Mesu, Kecamatan Pangkalan Baru, Kabupaten Bangka Tengah,” MINERAL, vol. 2, no. 1, pp. 8-15, 2020. doi: https://doi.org/10.33019/mineral.v2i1.1541
M. Oktakusgara, H. A. K. Abuamat, dan M. Yusuf, “Kajian Perbandingan Produktivitas Hopper dan Alat Angkut untuk Mengatasi Masalah Antrian Alat Angkut dan Meningkatkan Produktivitas Hopper Tls 3 Banko Barat PT Bukit Asam (Persero) Tbk Comparative Study Of Productivity Hopper Than Dump Truck For Overcom,” Jurnal Ilmu Teknik Sriwijaya. vol. 2, no. 4, 2014.
S. Rab, “Peta Geologi Lembar Jampang dan Balekambang,” Suara Geologi, 1975.
D. P. R. Susanto, “Kajian Teknis Produktivitas Unit Peremuk Batu Andesit di PT. Gawi Maju Karsa Kabupaten Provinsi Jawa Tengah,” Skripsi, Universitas Pembangunan Nasional, Yogayakarta, 2019.
A. Suhardin, M. S. Ulum, dan D. Darwis, “Penentuan Komposisi Serta Suhu Kalsinasi Optimum CaO dari Batu Kapur Kecamatan Banawa Determining The Composition and Optimum Calcination Temperature of CaO of Banawa Limestone,” Natural Science: Journal of Science and Technology, vol. 7, no. 1, pp. 30-35, 2018. doi: https://doi.org/10.22487/25411969.2018.v7.i1.9914
P. Prodjosumarto, “Pemindahan Tanah Mekanis,” Bandung: Institut Teknologi Bandung. 1993.
Prosiding ini memberikan akses terbuka langsung ke isinya dengan prinsip bahwa membuat penelitian tersedia secara gratis untuk publik mendukung pertukaran pengetahuan global yang lebih besar.
Semua artikel yang diterbitkan Open Access akan segera dan secara permanen gratis untuk dibaca dan diunduh semua orang.